Ethiopia begins testing of geothermal wells at Aluti Langano

0
2230
Ethiopia begins testing of geothermal wells at Aluti Langano

Ethiopia’s State-owned Ethiopian Electric Power (EEP) has commenced testing of recently drilled geothermal wells at the Aluto Langano site in central.

Located in the Ethiopian Rift Valley, the Aluto Langano geothermal site covers an area of 8 km2 near the Aluto Crater, a dormant volcano. The site already has a geothermal power plant that began operation in 1998 with a net production capacity of 7.3 MWe.

READ:KenGen Completes Construction of Olkaria I Unit 6 Geothermal Power Plant

This facility has been shut down since 2018 due to corrosion caused by steam, but also hydrothermal blockages and leaks on the steam pipes. Some observers attribute this to the lack of operating knowledge of the plant’s staff. The main challenge for Toshiba, Toyota Tsusho and Egesim Energy will be to build a geothermal power plant that can withstand the corrosion caused by steam. The geothermal site expansion project is funded by the Japan International Cooperation Agency (JICA) and the International Development Association (IDA), a subsidiary of the World Bank Group.

The ongoing drilling is being carried out by Kenya Electricity Generating Company (KenGen). The Kenyan government-owned company will drill a total of 12 geothermal wells at the Aluto Langano site.

The steam production tests is set to last three months, with two-week intervals for each well. Construction of the steam plant has been contracted to Toshiba Energy Systems & Solutions Corporation and Toyota Tsusho Corporation of Japan and Egesim Energy Electro-Mechanic Construction Contracting Co. of Turkey. The expansion project aims to develop 70 MWe of clean energy generation capacity.